Connecting & Protecting: sustainability & the Brenner Base Tunnel

The Brenner Base Tunnel will make a significant contribution to making passenger and freight transport across the Alps...

Another decisive step for the Brenner Base Tunnel

Tender for engineering services for railway equipment launched

Important breakthrough for the Brenner Base Tunnel

With the breakthrough between the Mules and the Isarco River Underpass construction lots, we now have a continuous...

Solemn ground-breaking ceremony at the H52-Hochstegen construction lot

Works are in full swing in all BBT construction lots in Austria; 151 km of the 230 km long tunnel systems have already...

Breakthrough in the last main tunnel under the Isarco river

About a month after the start of the works, the excavation works broke through today in the last main tunnel being built...

Dismantling of the TBM Serena has started

In the exploratory tunnel of the Brenner Base Tunnel, under the Brenner Pass to a depth of 1400 m, the dismantling of...