Temporary award in the tender procedure for the Mules 2-3 (Mules-Brennero) construction lot
In a public hearing this morning at its main offices in Bolzano, Galleria di Base del Brennero – Brenner Basistunnel BBT...
In a public hearing this morning at its main offices in Bolzano, Galleria di Base del Brennero – Brenner Basistunnel BBT...
A new web portal and a Green Corridor Development Plan will contribute to make transport within Europe more sustainable....
Just over half (about 5 km) of the 9.7 km Tulfes/Ampass emergency tunnel has already been excavated. On February 6th...
The Forestry Dept. of the city of Innsbruck is still hard at work on the Tantegert moor area. Soon, however, this bit of...