BBT Bilanzen 2018

57 LAGEBERICHT • Dengg, F.; Zeman, O.; Voit, K.; Bergmeister, K.: Fastening application in concrete using recycled tunnel excavation material. Structural Concrete, 2018. • Schreter, M.; Neuner, M.; Unteregger, D.; Hofstetter, G.: On the importance of advanced constitutive models in finite element simulations of deep tunnel advance. Tunnelling and Underground Space Technology, 80, S. 103-113, 2018. • Schneider-Muntau, B.; Cordes,T.: Comparison of measured and calculated interactions between slope creeping and tunnel structures. XVI Danube - European Conference on Geotechnical Engineering, Skopje, 2018. • Schneider-Muntau, B.; Reinhold, C.; Cordes, T.; Bathaeian, I.; Bergmeister, K.: Validation of longitudinal displacement profiles by measurement at the Brenner Base Tunnel. Geomechanics and Tunnelling 11, Nr. 5, 2018. • Brandtner, M.; Hofmann, M.; Paternesi, A.; Sauer, E.; Schweiger, H.; Walter, H.: Design strategies for sprayed concrete linings. Geomechanics and Tunnelling 11, Nr. 5, 2018. Im Laufe des Jahres 2018 hat Ing. Zurlo die folgenden Beiträge im Rahmen von Konferenzen veröffentlicht: • Zurlo, R.; Fuoco, S.; Marini, D.: Open and Shielded TBM Excavation for BBT». First Experiences in Using TBM in Different Rock Mass Condition Along the Brenner Base Tunnel. Swiss Tunnel Congress, Luzern, 2018. • Zurlo, R.: The Brenner Base Tunnel - Construction Risk Management. Verband der portugiesischen Tunnel, Lissabon, 2018. • Zurlo, R.: Lessons of Brenner regarding environmental impacts and communication around the project. Sharing experience From Construction of Long Tunnels at Great Depth - Itacet Foundation, Le Bourget du Lac, 2018. • Zurlo, R.: Problematiche ambientali connesse alla realizzazione della Galleria di Base del Brennero (Umweltprobleme im Zusammenhang mit dem Bau des Brenner Basistunnels, A.d.Ü.), Turin, 2018. • Zurlo, R.: The Brenner Base Tunnel: The goal, the Project and the Risk Policies, London, 2018. • Zurlo, R.: Der Brenner Basistunnel: das Projekt, der Bau und die Auswirkungen, Merano, 2018. • Zurlo, R.: The Brenner Base Tunnel: Project Development, Oslo, 2018. • Zurlo, R.: La Galleria di base del Brennero: le competenze in gioco per la realizzazione della galleria ferroviaria più lunga del mondo (Der Brenner Basistunnel: mit dem Bau des längsten Eisenbahn- tunnels der Welt verbundene Kompetenzen, A.d.Ü.), Trient, 2018.

RkJQdWJsaXNoZXIy Mjc1MzM=