The brenner base tunnel

Thanks to the Brenner Base Tunnel, travel time will be reduced and there will be more capacity available on the existing railway line. GALLERIA DI BASE DEL BRENNERO BRENNER BASISTUNNEL BRENNER BASE TUNNEL Munich Rosenheim Kufstein/Kiefersfelden Innsbruck Fortezza Franzensfeste Bolzano Bozen Trento Trient Verona Radfeld Baumkirchen Tulfes Ponte Gardena Waidbruck Rovereto Borghetto Pescantina Schaf tenau Munich-Trudering Grafing Ostermünchen THE BRENNER BASE TUNNEL PROJECT

RkJQdWJsaXNoZXIy Mjc1MzM=