The brenner base tunnel

All water flowing from the tunnel during the construction phase is purified in the water treatment plants. The Wolf construction site has a direct access to the A13 Brenner motorway and, via its own rail link, to the Brenner Base Tunnel.

RkJQdWJsaXNoZXIy Mjc1MzM=