1
38
40
48
The brenner base tunnel
The Tivoli weir is located within the territory of the city of Innsbruck and is part of a power plant on the Sill. Revitalisation of the Tantegert marsh area near Innsbruck
Made with FlippingBook
RkJQdWJsaXNoZXIy Mjc1MzM=