Come discover tunnel world

4 5 COME DISCOVER TUNNEL WORLD 1. The Brenner Pass • Reception / Brochures • Large route layout showing the progress of the excavation • Footprints over the Alps • The path over the Brenner Pass NEW! • Radio time machine • Antique telephone used along the rail line (1) NEW! 2. BBT Display Tunnel • Display tunnel (1) Drill & Blast excavation • Tunnel construction terms • Tunnel construction equipment • Drills for tunnel construction NEW! • Re-breathers with up to 90 minutes of air NEW! • Display tunnel (2) Machine excavation NEW! • Railway Outfitting NEW! 3. Adventures for kids • Giant building blocks • Construction manager NEW! • A model of the route of the BBT NEW! • Rock drill • Blasting expert • Whispering tube • Stories and legends • Animals who build tunnels • Tunnel construction quiz • Endless tunnel • Climbing wall • Jobs deep underground 4. Train simulator • Railjet train simulator NEW! 5. Geology of the Alps • Drill cores • Plant life in the Alpine habitat NEW! • Stereo photoviewer • Groundwater • Plate tectonics • Mountain orogeny NEW! • Seismograph • Microscope • Magic lenses 6. Technology & traffic • Antique telephone used along the rail line (2) NEW! • Geophone • Laser measuring tool • Tension lines • Vaulted arch • Trains as a means of transport • Ahrental substation NEW! • Straight across Europe • Traffic Master 7. The Brenner Base Tunnel Project • New pathways for Europe • A project makes history • Well invested • Model of the Sill gorge NEW! • Photos – Tunnel time machine • BBT SE • The works • One team, one goal NEW! • Facts quiz • Geological profile with construction work progress • Tunnel cinema – BBT SE Forum • Recycle and Re-use NEW! • Our environment – commitment and added value 8. Tunnel boring machine (TBM) • Model of an “Open Gripper TBM“ • Tunnel boring machines at work NEW! • TBM cutting discs chisels NEW! 9. Cutter head • Original cutter head – (World record-making TBM) NEW! 10. Outside area • Stone xylophone • Humming stone • Excavating machine • Sand transport game 7 8 1 2 6 3 5 Upper Level Lower Level 4 10 Start 9

RkJQdWJsaXNoZXIy Mjc1MzM=