Padastertal circular hiking trail

How to reach the walking circuit ARRIVAL BY BUS ORTRAIN The hiking trail is about 15 minutes on foot (1 km) from Steinach railway station, walking from the platform to the pedestrian underpass and then along the path next to the railway (i.e. to the left of it) southwards to the locality of Siegreith. Then follow the path in the direction of the Padastertal car park. From the Tunnelwelten car park, bear left over the bridge towards the centre of Steinach am Brenner until you reach the junction with the Brenner Bundesstraße B182 and make a sharp right onto it. After 900 m turn left onto “Harland” in the direction of “Polizei/ Rettung” (see photo of the intersection), drive through the underpass and then turn right at the first opportunity onto Padasterweg. Follow this until the next fork in the road. Turn left and then left again at the next fork. Follow the road, which will slope slightly upwards to the small Padaster valley parking lot. From there, it is just a few steps to both the chapel of St. Wendelin and the starting point of the circular hiking trail. ARRIVAL BY CAR

RkJQdWJsaXNoZXIy Mjc1MzM=